Renovations
Frenchs Forest





We replaced the pebblecrete surrounds and garden beds around this pool with a new slab and limestone, giving the owners more room. Inside the pool, clear glass bead replaced the old pebblecrete.
- Date
December 2025
- Size
9 x 5 m
- Timeline
6 weeks
- Budget
$100,000+
Scope of works
Demolition
Strip-out of the pool interior, pebblecrete surrounds and garden beds.

Concrete
New concrete slab doweled into the pool shell, waterproofed and tiled.

Pool interior
Full waterproofing, clear glass bead interior and glass mosaic waterline.

Coping
Dip-sealed limestone coping, lowered to the drain, with stainless steel grating.

Equipment and hydraulics
Equipment moved into an acoustic box, with updated filtration.


Problems and fixes
Pebblecrete surrounds
The pool had pebblecrete surrounds, with garden beds limiting the space around it. We removed both and poured a new concrete slab doweled into the pool shell, waterproofed before tiling.
Drain falls
The coping was too high for the surrounds to fall to the existing drain. We lowered the coping around the whole pool and fitted stainless steel grating to the channel drain.
Bush rock edges
The pool area is off square, with bush rock along one side. Our tilers cut the limestone to every angle and around the rock.
Equipment position
We moved the pool equipment to a new position, updated the filtration and enclosed it all in an acoustic box.
MATERIALS
Clear glass bead interior
Beadcrete
Island Resort glass mosaic
Barefoot Living
Lavado limestone
Barefoot Living
Hydro Ban waterproofing
Laticrete
Acoustic pool equipment box
Acoustic Box
STANDOUT FEATURES
New slab doweled into the pool shell
Coping lowered to fall to the drain
Limestone cut around the bush rock