Precast

Freshwater

Pool edge and white wall with tropical planting.
Full length of the precast pool with pale coping and planting.
Precast pool beside a white rendered wall, with planting along one side.
Glass pool fence and tropical planting around the finished pool.
Close view of the green glass mosaic interior and coping edge.

This fully tiled Precast Pools Southern 4.0 runs as a heated freshwater pool on an established Freshwater block, and it reached the site on a 130 tonne crane that lifted it over two buildings.

Date

November 2023

Size

Southern 4 x 3 m

Budget

$60,000 to $80,000

Glass pool fence and tropical planting around the finished pool.
Full length of the precast pool with pale coping and planting.
One way in, over two buildings

The property was already built out, with the main home at the front and a detached dwelling at the rear, so the only way in for a 10 tonne shell was up and over both. The owners’ builder excavated the site down to rock, and we laid a level blue metal base for the shell to land on.

Closing the road for the lift

A 130 tonne crane was set up on the street behind the property, which was closed with traffic control for the lift. Residents were notified two weeks before, and our team coordinated the crane crew, traffic controllers and builder through the day. The shell cleared both buildings by about a metre as it came in.

The owners now have a heated freshwater pool with its equipment housed in a soundproof enclosure on the boundary, and they’ve since asked us back to look after it on a regular maintenance schedule.

Finishes and Equipment

INTERIOR

Etch Mosaics by Artisan Exterior

Close view of the green glass mosaic interior and coping edge.

Willow by Artisan Exterior


Water surface over green glass mosaic beside a white fence.

Naked Swim Freshwater Sanitiser

Madimack InverELITE V3 12 kW Heat Pump



Naked NKD-pH controller in black, with a peristaltic dosing pump head on the front

PROJECT STATISTICS

0t

Crane used for lift

0t

Precast shell lifted in

0m

Approximate clearance over both buildings